DECK PANEL LAYUP SCHEDULE

ISO 12215-5:2008 — Panel D1 (Aft 1/3 L_H) · D2 (Mid 1/3 L_H) · D3 (Fwd 1/3 L_H) — ISO 12215-5:2008

Pilih kapal lalu klik Hitung 3 Zona untuk mengisi tabel Panel D1 / D2 / D3 (Aft / Mid / Fwd 1/3 L_H) sesuai format Self-Certifier ISO 12215-5.
PANEL D1 Zone Aft 1/3 L_H
b (mm)—L (mm)—
x (m)—kL—
P (kPa)—Mode—
treq (mm)—wos (gsm)—
Ply Label No. Glass +Resin t (mm)
Total t_skin / t_core —
ISO-12215-5 Requirement
Criterion Required Actual CF RESULT
Thickness / Fibre — — — —
Flexural strength (N·m) — — — —
Shear strength (N) — — — —
Stiffness (N·m²) — — — —
PANEL D2 Zone Middle 1/3 L_H
b (mm)—L (mm)—
x (m)—kL—
P (kPa)—Mode—
treq (mm)—wos (gsm)—
Ply Label No. Glass +Resin t (mm)
Total t_skin / t_core —
ISO-12215-5 Requirement
Criterion Required Actual CF RESULT
Thickness / Fibre — — — —
Flexural strength (N·m) — — — —
Shear strength (N) — — — —
Stiffness (N·m²) — — — —
PANEL D3 Zone Forward 1/3 L_H
b (mm)—L (mm)—
x (m)—kL—
P (kPa)—Mode—
treq (mm)—wos (gsm)—
Ply Label No. Glass +Resin t (mm)
Total t_skin / t_core —
ISO-12215-5 Requirement
Criterion Required Actual CF RESULT
Thickness / Fibre — — — —
Flexural strength (N·m) — — — —
Shear strength (N) — — — —
Stiffness (N·m²) — — — —